A CP Approach to the Scheduling of Resource-Constrained Multiproduct Continuous Facilities
; Henning, Gabriela Patricia 
Otros responsables
Fecha
06/2006
Editorial
Planta Piloto de Ingeniería Química
Revista
Latin American Applied Research
Título del libro
Nombre del evento
Fecha del evento
Institución organizadora
ISSN
0327-0793
eISSN
1851-8796
ISBN
Idioma
Inglés
Tipo del evento
Clasificación temática
Palabras clave
Resumen
This contribution presents a new Constraint Programming (CP) formulation to address the optimal operation of multiproduct continuous processes. In particular, facilities having continuous stages, which manufacture intermediate or final products and a limited number of intermediate storage tanks, are tackled. The problem involves finding (i) the optimal sequence of production runs and (ii) the optimal agenda of usage of each storage tank. The proposed formulation is able to handle different features found in industrial environments such as dissimilar machines, sequence-dependent changeover times, forbidden campaign-machine assignments, production runs´ length constraints, etc. Moreover, one of the main contributions of this paper is the handling of constrained resources of various types, such as intermediate storage tanks of limited capacity and qualified manpower required at some stages.
Colecciones
Aprobación
Revisión
Complementado por
Referenciado por
Licencia Creative Commons
Excepto donde se indique lo contrario, la licencia de este ítem se describe como by-nc-sa
