Multiperiod production planning and design of batch plants under uncertainty
; Montagna, Jorge Marcelo 
Otros responsables
Fecha
05/2012
Editorial
Pergamon-Elsevier Science Ltd
Revista
Computers and Chemical Engineering
Título del libro
Nombre del evento
Fecha del evento
Institución organizadora
ISSN
0098-1354
eISSN
ISBN
Idioma
Inglés
Tipo del evento
Clasificación temática
Palabras clave
Resumen
A two-stage stochastic multiperiod LGDP (linear generalized disjunctive programming) model was developed to address the integrated design and production planning of multiproduct batch plants. Both problems are encompassed considering uncertainty in product demands represented by a set of scenarios. The design variables are modeled as here-and-now decisions which are made before the demand realization, while the production planning variables are delayed in a wait-and-see mode to optimize in the face of uncertainty. Specifically, the proposed model determines the structure of the batch plant (duplication of units in series and in parallel) and the unit sizes, together with the production planning decisions in each time period within each scenario. The model also allows the incorporation of new equipment items at different periods. The objective is to maximize the expected net present value of the benefit. To assess the advantages of the proposed formulation, an extraction process that produces oleoresins is solved.
Colecciones
Aprobación
Revisión
Complementado por
Referenciado por
Licencia Creative Commons
Excepto donde se indique lo contrario, la licencia de este ítem se describe como by-nc-nd
