Artículo

Multiperiod production planning and design of batch plants under uncertainty

Moreno, Marta Susana Icon; Montagna, Jorge Marcelo Icon

Otros responsables

Fecha

05/2012

Editorial

Pergamon-Elsevier Science Ltd

Revista

Computers and Chemical Engineering

Título del libro

Nombre del evento

Fecha del evento

Institución organizadora

ISSN

0098-1354

eISSN

ISBN

Idioma

Inglés

Tipo del evento

Clasificación temática

Resumen

A two-stage stochastic multiperiod LGDP (linear generalized disjunctive programming) model was developed to address the integrated design and production planning of multiproduct batch plants. Both problems are encompassed considering uncertainty in product demands represented by a set of scenarios. The design variables are modeled as here-and-now decisions which are made before the demand realization, while the production planning variables are delayed in a wait-and-see mode to optimize in the face of uncertainty. Specifically, the proposed model determines the structure of the batch plant (duplication of units in series and in parallel) and the unit sizes, together with the production planning decisions in each time period within each scenario. The model also allows the incorporation of new equipment items at different periods. The objective is to maximize the expected net present value of the benefit. To assess the advantages of the proposed formulation, an extraction process that produces oleoresins is solved.

Aprobación

Revisión

Complementado por

Referenciado por

Licencia Creative Commons

Excepto donde se indique lo contrario, la licencia de este ítem se describe como by-nc-nd