Robust integrated production-maintenance scheduling for an evaporation network
; de Prada, C. Otros responsables
Fecha
02/2018
Editorial
Pergamon-Elsevier Science Ltd
Revista
Computers and Chemical Engineering
Título del libro
Nombre del evento
Fecha del evento
Institución organizadora
ISSN
0098-1354
eISSN
ISBN
Idioma
Inglés
Tipo del evento
Clasificación temática
Palabras clave
Resumen
This work aims to reduce the global resource consumption in an industrial evaporation network by better tasks management and coordination. The network works in continuous, processing some products in several evaporation plants, so optimal load allocation and product-plant assignment problems appear. The plants have different features (capacity, equipment, etc.) and their performance is affected by fouling inside the heat exchangers and external factors. Hereby, the optimizer has to decide when maintenance operations have to be triggered. Therefore, a mixed production/maintenance scheduling problem arises. The plant behavior is approximated by surrogate linear models obtained experimentally, allowing thus the use of mixed-integer linear optimization routines to obtain solutions in acceptable time. Furthermore, uncertainty in the weather forecast and in the production plan is also considered via a two-stage stochastic programming approach. Finally, a trade-off analysis between other objectives of interest is given to support the decision maker.
Colecciones
Aprobación
Revisión
Complementado por
Referenciado por
Licencia Creative Commons
Excepto donde se indique lo contrario, la licencia de este ítem se describe como by-nc-sa
