Dynamic Scheduling of Multiproduct Pipelines with Multiple Delivery Due Dates
; Cerda, Jaime 
Otros responsables
Fecha
12/2008
Editorial
Elsevier
Revista
Computers and Chemical Engineering
Título del libro
Nombre del evento
Fecha del evento
Institución organizadora
ISSN
0098-1354
eISSN
ISBN
Idioma
Inglés
Tipo del evento
Clasificación temática
Palabras clave
Resumen
Scheduling product batches in pipelines is a very complex task with many constraints to be considered. Several papers have been published on the subject during the last decade. Most of them are based on large-size MILP discrete time scheduling models whose computational efficiency greatly diminishes for rather long time horizons. Recently, anMILPcontinuous problem representation in both time and volume providing better schedules at much lower computational cost has been published.However, all model-based scheduling techniques were applied to examples assuming a static market environment, a short single-period time horizon and a unique due-date for all deliveries at the horizon end. In contrast, pipeline operators generally use a monthly planning horizon divided into a number of equal-length periods and a cyclic scheduling strategy to fulfill terminal demands at period ends. Moreover, the rerouting of shipments and time-dependent product requirements at distribution terminals force the scheduler to continuously update pipeline operations. To address such big challenges facing the pipeline industry, thiswork presents an efficient MILP continuous-time framework for the dynamic scheduling of pipelines over a multiperiod moving horizon. At the completion time of the current period, the planning horizon moves forward and the re-scheduling process based on updated problem data is triggered again over the newhorizon. Pumping runs may extend over two or more periods and a different sequence of batches may be injected at each one. The approach has successfully solved a real-world pipeline scheduling problem involving the transportation of four products to five destinations over a rolling horizon always comprising four 1-week periods.
Colecciones
Aprobación
Revisión
Complementado por
Referenciado por
Licencia Creative Commons
Excepto donde se indique lo contrario, la licencia de este ítem se describe como by-nc-sa