Flexible investment decisions in the European interconnected transmission system
; Olsina, Fernando Gabriel
; Rehtanz, C. Otros responsables
Fecha
04/2011
Editorial
Elsevier Science
Revista
Electric Power Systems Research
Título del libro
Nombre del evento
Fecha del evento
Institución organizadora
ISSN
0378-7796
eISSN
ISBN
Idioma
Inglés
Tipo del evento
Clasificación temática
Palabras clave
Resumen
Investment decisions in the power transmission system are vulnerable to substantial long-term uncertainties. Especially, in large interconnected power systems like in Europe, the impact of different influencing factors on the decision-making process is hard to estimate. In the presented approach, stochastic simulations incorporate uncertainties like the development of fuel costs and demand growth. The resulting operation plan of the available power plants and the respective utilization of the transmission network are obtained by calculating the (least-cost) optimal power flow. The performance of possible network upgrades in uncertain scenarios is evaluated by applying a real options approach based on Monte Carlo simulations. The focus of the presented work is on the strategic flexibility that FACTS devices can offer in order to appropriately cope with the uncertain development of the future. A case study for the cross-border connection between Germany and the Netherlands shows the applicability and practicability of the presented approach.
Colecciones
Aprobación
Revisión
Complementado por
Referenciado por
Licencia Creative Commons
Excepto donde se indique lo contrario, la licencia de este ítem se describe como by-nc-nd