The Social Cost of Dredging: The Bahia Blanca Estuary Case
; London, Silvia
; Perillo, Gerardo Miguel E.
; Piccolo, Maria Cintia 
Otros responsables
Fecha
01/2013
Editorial
Elsevier
Revista
Ocean & Coastal Management
Título del libro
Nombre del evento
Fecha del evento
Institución organizadora
ISSN
0964-5691
eISSN
ISBN
Idioma
Inglés
Tipo del evento
Clasificación temática
Palabras clave
Resumen
The Bahia Blanca Estuary System constitutes an ecosystem unique in the world by its physical, geographic and biological characteristics. In the frame of a major investment project related with natural gas provision, a dredging process has been planned and its execution results imminent. However, the analysis of socioeconomic effects of this dredging process has not been performed up to now. In this context, our objective is to estimate social costs and benefits of the dredging process related with the gas plant project mainly derived from the loss of the nursery services of the estuary and the loss of the jobs associated with fishing activities. Our results indicate that socioeconomic cost of the dredging related with the project is between US$ 5 million and US$ 6.5 million depending on how the displaced labor force can be reallocated.
Aprobación
Revisión
Complementado por
Referenciado por
Licencia Creative Commons
Excepto donde se indique lo contrario, la licencia de este ítem se describe como by-nc-sa
