Optimal Scheduling of Multiproduct Pipeline Systems Using a Non-discrete MILP Formulation
; Cerda, Jaime 
Otros responsables
Fecha
10/2004
Editorial
Elsevier
Revista
Computers and Chemical Engineering
Título del libro
Nombre del evento
Fecha del evento
Institución organizadora
ISSN
0098-1354
eISSN
ISBN
Idioma
Inglés
Tipo del evento
Clasificación temática
Palabras clave
Resumen
Multiproduct pipelines permit to transport large volumes of a wide range of refined petroleum products from major supply sources to distribution centers near market areas. Batches of refined products and grades are pumped back-to-back in the same pipeline, often without any separation device between batches. The sequence and lengths of such pumping runs should be carefully selected in order to meet market demands at the promised dates while satisfying many pipeline operational constraints. This paper deals with the scheduling of a multiproduct pipeline system receiving a number of liquid products from a single refinery source to distribute them among several depots. A novel MILP continuous mathematical formulation that neither uses time discretization nor division of the pipeline into a number of single-product packs is presented. By developing a more rigorous problem representation, the quality of the pipeline schedule is significantly improved. Moreover, a severe reduction in binary variables and CPU time with regards to previous approaches is also achieved. To illustrate the proposed approach, a pair of real-world case studies was solved. Both involve the scheduling of a single pipeline carrying four oil derivatives from an oil refinery to five distribution depots. Higher pumping costs at daily peak periods were also considered. Compared with previous work, better solutions were found at much lower computational time.
Colecciones
Aprobación
Revisión
Complementado por
Referenciado por
Licencia Creative Commons
Excepto donde se indique lo contrario, la licencia de este ítem se describe como by-nc-sa
