Mostrar el registro sencillo del ítem
dc.contributor.author
Aguirre, Adrian Marcelo
dc.contributor.author
Mendez, Carlos Alberto
dc.contributor.author
Castro, Pedro
dc.date.available
2016-12-14T14:25:26Z
dc.date.issued
2014-01
dc.identifier.citation
Aguirre, Adrian Marcelo; Mendez, Carlos Alberto; Castro, Pedro; A hybrid scheduling approach for automated flowshops with material handling and time constraints; Taylor & Francis; International Journal Of Production Research; 52; 9; 1-2014; 2788-2806
dc.identifier.issn
0020-7543
dc.identifier.uri
http://hdl.handle.net/11336/9326
dc.description.abstract
Flowshop scheduling problems have been extensively studied by several authors using different approaches. A typical flowshop process consists of successive manufacturing stages arranged in a single production line where different jobs have to be processed following a predefined production recipe. In this work, the scheduling of a complex flowshop process involving Automated Wet-Etch Station (AWS) from Semiconductor Manufacturing Systems, requires a proper synchronization of processing and transport operations, due to stringent storage policies and fixed transfer times between stages. Robust hybrid solution strategies based on mixed integer linear programming (MILP) formulations and heuristic-based approaches, such as aggregation and decomposition methods, are proposed and illustrated on industrial scale problems. The results show significant improvements in solution quality coupled with a reduced computational effort compared to other existing methodologies.
dc.format
application/pdf
dc.language.iso
eng
dc.publisher
Taylor & Francis
dc.rights
info:eu-repo/semantics/openAccess
dc.rights.uri
https://creativecommons.org/licenses/by-nc-sa/2.5/ar/
dc.subject
Flowshop
dc.subject
Scheduling
dc.subject
Aws
dc.subject.classification
Ingeniería de Procesos Químicos
dc.subject.classification
Ingeniería Química
dc.subject.classification
INGENIERÍAS Y TECNOLOGÍAS
dc.title
A hybrid scheduling approach for automated flowshops with material handling and time constraints
dc.type
info:eu-repo/semantics/article
dc.type
info:ar-repo/semantics/artículo
dc.type
info:eu-repo/semantics/publishedVersion
dc.date.updated
2016-12-12T13:44:00Z
dc.journal.volume
52
dc.journal.number
9
dc.journal.pagination
2788-2806
dc.journal.pais
Reino Unido
dc.journal.ciudad
Londres
dc.description.fil
Fil: Aguirre, Adrian Marcelo. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Santa Fe. Instituto de Desarrollo Tecnológico para la Industria Química (i); Argentina
dc.description.fil
Fil: Mendez, Carlos Alberto. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Santa Fe. Instituto de Desarrollo Tecnológico para la Industria Química (i); Argentina
dc.description.fil
Fil: Castro, Pedro. UMOSE/LNEG; Portugal
dc.journal.title
International Journal Of Production Research
dc.relation.alternativeid
info:eu-repo/semantics/altIdentifier/url/http://www.tandfonline.com/doi/abs/10.1080/00207543.2014.885664
dc.relation.alternativeid
info:eu-repo/semantics/altIdentifier/doi/http://dx.doi.org/10.1080/00207543.2014.885664
Archivos asociados