Mostrar el registro sencillo del ítem

dc.contributor.author
Samper, Mauricio Eduardo  
dc.contributor.author
Vargas, Alberto  
dc.date.available
2017-08-23T21:33:34Z  
dc.date.issued
2013-08  
dc.identifier.citation
Samper, Mauricio Eduardo; Vargas, Alberto; Investment decisions in distribution networks under uncertainty with distributed generation-part II: Implementation and results; Institute of Electrical and Electronics Engineers; Ieee Transactions On Power Systems; 28; 3; 8-2013; 2341-2351  
dc.identifier.issn
0885-8950  
dc.identifier.uri
http://hdl.handle.net/11336/22908  
dc.description.abstract
Investment in distributed generation (DG) is an attractive distribution planning option for adding flexibility to an expansion plan, mainly by deferring network reinforcements. In this first part of a two-part paper, a risk-based optimization approach is proposed to model a multistage distribution expansion planning problem that takes DG into account as a flexible option to temporarily defer large network investments. Five features of the installation of DG related to location, size, type, operation and timing are all optimized. The evolutionary particle swarm optimization (EPSO) method is applied to solve this mixed integer nonlinear problem. A return-per-risk index is proposed to assess expansion investments. This index achieves an efficient synergy between the expected return and the risk of investments by performing Monte Carlo simulations. In turn, the flexibility of network investment deferral is assessed through a real option valuation. Finally, in order to quantify the investment deferral benefit, the expected return from a traditional expansion plan (without DG) is compared to the return obtained from a flexible expansion plan (with DG). In the companion paper, the proposed approach is tested on a typical Latin American distribution network; implementation aspects and analysis of numerical results are presented.  
dc.format
application/pdf  
dc.language.iso
eng  
dc.publisher
Institute of Electrical and Electronics Engineers  
dc.rights
info:eu-repo/semantics/openAccess  
dc.rights.uri
https://creativecommons.org/licenses/by-nc-sa/2.5/ar/  
dc.subject
Distributed Generation  
dc.subject
Epso  
dc.subject
Distribution Planning  
dc.subject
Expansion Decisions  
dc.subject
Real Options  
dc.subject
Risk Analysis  
dc.subject.classification
Ingeniería de Sistemas y Comunicaciones  
dc.subject.classification
Ingeniería Eléctrica, Ingeniería Electrónica e Ingeniería de la Información  
dc.subject.classification
INGENIERÍAS Y TECNOLOGÍAS  
dc.title
Investment decisions in distribution networks under uncertainty with distributed generation-part II: Implementation and results  
dc.type
info:eu-repo/semantics/article  
dc.type
info:ar-repo/semantics/artículo  
dc.type
info:eu-repo/semantics/publishedVersion  
dc.date.updated
2017-08-22T21:24:00Z  
dc.identifier.eissn
1558-0679  
dc.journal.volume
28  
dc.journal.number
3  
dc.journal.pagination
2341-2351  
dc.journal.pais
Estados Unidos  
dc.journal.ciudad
Nueva York  
dc.description.fil
Fil: Samper, Mauricio Eduardo. Universidad Nacional de San Juan. Facultad de Ingeniería. Instituto de Energia Eléctrica; Argentina. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Conicet - San Juan. Instituto de Energia Eléctrica. Universidad Nacional de San Juan. Facultad de Ingeniería. Instituto de Energia Eléctrica; Argentina  
dc.description.fil
Fil: Vargas, Alberto. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Conicet - San Juan. Instituto de Energia Eléctrica. Universidad Nacional de San Juan. Facultad de Ingeniería. Instituto de Energia Eléctrica; Argentina  
dc.journal.title
Ieee Transactions On Power Systems  
dc.relation.alternativeid
info:eu-repo/semantics/altIdentifier/url/http://ieeexplore.ieee.org/document/6450148/  
dc.relation.alternativeid
info:eu-repo/semantics/altIdentifier/doi/http://dx.doi.org/10.1109/TPWRS.2013.2239667