Mostrar el registro sencillo del ítem
dc.contributor.author
Blanco, G.
dc.contributor.author
Waniek, D.
dc.contributor.author
Garces, Francisco Felipe
dc.contributor.author
Olsina, Fernando Gabriel
dc.contributor.author
Rehtanz, C.
dc.date.available
2017-02-15T15:44:22Z
dc.date.issued
2011-04
dc.identifier.citation
Blanco, G.; Waniek, D.; Garces, Francisco Felipe; Olsina, Fernando Gabriel; Rehtanz, C.; Flexible investment decisions in the European interconnected transmission system; Elsevier Science; Electric Power Systems Research; 81; 4; 4-2011; 984-994
dc.identifier.issn
0378-7796
dc.identifier.uri
http://hdl.handle.net/11336/13055
dc.description.abstract
Investment decisions in the power transmission system are vulnerable to substantial long-term uncertainties. Especially, in large interconnected power systems like in Europe, the impact of different influencing factors on the decision-making process is hard to estimate. In the presented approach, stochastic simulations incorporate uncertainties like the development of fuel costs and demand growth. The resulting operation plan of the available power plants and the respective utilization of the transmission network are obtained by calculating the (least-cost) optimal power flow. The performance of possible network upgrades in uncertain scenarios is evaluated by applying a real options approach based on Monte Carlo simulations. The focus of the presented work is on the strategic flexibility that FACTS devices can offer in order to appropriately cope with the uncertain development of the future. A case study for the cross-border connection between Germany and the Netherlands shows the applicability and practicability of the presented approach.
dc.format
application/pdf
dc.language.iso
eng
dc.publisher
Elsevier Science
dc.rights
info:eu-repo/semantics/openAccess
dc.rights.uri
https://creativecommons.org/licenses/by-nc-nd/2.5/ar/
dc.subject
Flexible Ac Transmission System
dc.subject
Power System Planning
dc.subject
Power Transmission Lines
dc.subject
Optimization
dc.subject
Uncertainty
dc.subject.classification
Ingeniería Eléctrica y Electrónica
dc.subject.classification
Ingeniería Eléctrica, Ingeniería Electrónica e Ingeniería de la Información
dc.subject.classification
INGENIERÍAS Y TECNOLOGÍAS
dc.title
Flexible investment decisions in the European interconnected transmission system
dc.type
info:eu-repo/semantics/article
dc.type
info:ar-repo/semantics/artículo
dc.type
info:eu-repo/semantics/publishedVersion
dc.date.updated
2017-02-13T20:30:38Z
dc.journal.volume
81
dc.journal.number
4
dc.journal.pagination
984-994
dc.journal.pais
Países Bajos
dc.journal.ciudad
Ámsterdam
dc.description.fil
Fil: Blanco, G.. Universidad Nacional de Asuncion; Paraguay
dc.description.fil
Fil: Waniek, D.. Universitat Dortmund; Alemania
dc.description.fil
Fil: Garces, Francisco Felipe. Consejo Nacional de Investigaciones Cientificas y Tecnicas. Centro Cientifico Tecnologico San Juan. Instituto de Energia Electrica; Argentina
dc.description.fil
Fil: Olsina, Fernando Gabriel. Consejo Nacional de Investigaciones Cientificas y Tecnicas. Centro Cientifico Tecnologico San Juan. Instituto de Energia Electrica; Argentina
dc.description.fil
Fil: Rehtanz, C.. Universitat Dortmund; Alemania
dc.journal.title
Electric Power Systems Research
dc.relation.alternativeid
info:eu-repo/semantics/altIdentifier/url/http://www.sciencedirect.com/science/article/pii/S0378779610003056
dc.relation.alternativeid
info:eu-repo/semantics/altIdentifier/doi/http://dx.doi.org/10.1016/j.epsr.2010.12.001
Archivos asociados