Mostrar el registro sencillo del ítem

dc.contributor.author
Vecchietti, Aldo  
dc.contributor.author
Rodriguez, Maria Analia  
dc.date.available
2016-08-05T15:50:37Z  
dc.date.issued
2013-01  
dc.identifier.citation
Vecchietti, Aldo; Rodriguez, Maria Analia; Integrated planning and scheduling with due dates in corrugated board boxes industry; American Chemical Society; Industrial & Engineering Chemical Research; 52; 2; 1-2013; 847-860  
dc.identifier.issn
0888-5885  
dc.identifier.uri
http://hdl.handle.net/11336/6951  
dc.description.abstract
An integrated approach that solves the cutting stock problem and scheduling is considered in this article. The main challenging characteristics of this problem are given by its combinatorial nature, as well as the nonconvexities appearing in the formulation. Scheduling decisions are directly affected by cutting patterns and present changeover times that are sequence-dependent. Given the problem complexity, in general, cutting stock optimization has been considered independently from the scheduling problem. However, a cutting plan that defines the sequence in which patterns are processed is essential in order to obtain a solution in the context of corrugated board boxes industry. In order to obtain a global solution, the approach that has been developed uses a disjunctive technique to transform the original nonconvex formulation into a mixed-integer linear programming (MILP) model; whereas a continuous time representation is assumed to model sequencing decisions by applying general and immediate precedence constraints. Both scheduling models are presented and compared in three examples, showing efficient solutions for the integrated problem.  
dc.format
application/pdf  
dc.language.iso
eng  
dc.publisher
American Chemical Society  
dc.rights
info:eu-repo/semantics/openAccess  
dc.rights.uri
https://creativecommons.org/licenses/by-nc-sa/2.5/ar/  
dc.subject
Planning  
dc.subject
Scheduling  
dc.subject
Due Dates  
dc.subject
Board Boxes  
dc.subject.classification
Otras Ingenierías y Tecnologías  
dc.subject.classification
Otras Ingenierías y Tecnologías  
dc.subject.classification
INGENIERÍAS Y TECNOLOGÍAS  
dc.title
Integrated planning and scheduling with due dates in corrugated board boxes industry  
dc.type
info:eu-repo/semantics/article  
dc.type
info:ar-repo/semantics/artículo  
dc.type
info:eu-repo/semantics/publishedVersion  
dc.date.updated
2016-08-01T18:35:42Z  
dc.journal.volume
52  
dc.journal.number
2  
dc.journal.pagination
847-860  
dc.journal.pais
Estados Unidos  
dc.journal.ciudad
Washington  
dc.description.fil
Fil: Vecchietti, Aldo. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Santa Fe. Instituto de Desarrollo y Diseño (i); Argentina  
dc.description.fil
Fil: Rodriguez, Maria Analia. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Santa Fe. Instituto de Desarrollo y Diseño (i); Argentina  
dc.journal.title
Industrial & Engineering Chemical Research  
dc.relation.alternativeid
info:eu-repo/semantics/altIdentifier/url/http://pubs.acs.org/doi/abs/10.1021/ie302109j  
dc.relation.alternativeid
info:eu-repo/semantics/altIdentifier/doi/http://dx.doi.org/10.1021/ie302109j  
dc.relation.alternativeid
info:eu-repo/semantics/altIdentifier/doi/10.1021/ie302109j