Artículo
Simultaneous optimization of production planning and inventory management of polyurethane foam plant
Fecha de publicación:
03/2018
Editorial:
Springer
Revista:
Optimization And Engineering
ISSN:
1389-4420
Idioma:
Inglés
Tipo de recurso:
Artículo publicado
Clasificación temática:
Resumen
In this work, the management of a polyurethane foam plant is tackled through a mixed integer linear programming model that simultaneously solves production and inventory planning problems. The production process considers the foaming stage where large polyurethane blocks are produced as well as the curing step where the blocks are dried. The proposed formulation takes into account several tradeoffs involved in the overall production process. The daily production planning is tightly related to production requirements, available space for the curing and stored elements. Moreover, the required time to dry blocks introduces a delay that must be appropriately considered in order to allow an adequate operation of downstream operations. Thus, an integrated approach where all these problems are jointly addressed is proposed using a mathematical programming model. Several study cases provided by a local company are tested to demonstrate the model performance.
Palabras clave:
Inventory Management
,
Milp
,
Polyurethane Foam
,
Production Planning
Archivos asociados
Licencia
Identificadores
Colecciones
Articulos(INGAR)
Articulos de INST.DE DESARROLLO Y DISEÑO (I)
Articulos de INST.DE DESARROLLO Y DISEÑO (I)
Citación
Rodriguez, Maria Analia; Corsano, Gabriela; Vecchietti, Aldo; Montagna, Jorge Marcelo; Simultaneous optimization of production planning and inventory management of polyurethane foam plant; Springer; Optimization And Engineering; 19; 1; 3-2018; 97-123
Compartir
Altmétricas