Mostrar el registro sencillo del ítem

dc.contributor.author
Rossit, Daniel Alejandro  
dc.contributor.author
Tohmé, Fernando Abel  
dc.contributor.other
Ram, Mangey  
dc.date.available
2021-04-16T15:45:45Z  
dc.date.issued
2021  
dc.identifier.citation
Rossit, Daniel Alejandro; Tohmé, Fernando Abel; The tolerance scheduling problem for maximum lateness in Industry 4.0 systems; Elsevier; 2021; 95-113  
dc.identifier.isbn
978-0-12-818906-1  
dc.identifier.uri
http://hdl.handle.net/11336/130214  
dc.description.abstract
Industry 4.0 is a new production paradigm that promotes the digitalization of currentindustrial systems, in order to improve substantially their productivity andflexibility. This process has been pushed ahead by new technologies that arepoised to change the very concept of production, like cyber-physical systems(CPS) and the Internet of Things (IoT). CPS link the physical aspects of productionprocesses to digital platforms on which they run their virtual twins. Thus,CPS integrate in a single space the physical and digital ones (Lee et al., 2015;Platzer, 2018). The IoT, in turn, facilitates the connection of different CPS, transmittingthe real-time data collected by sensors in the physical space. The CPSwill take care of most decision-making processes, particularly routine ones(Rossit and Tohme´, 2018). All this yields smart manufacturing systems, runningautonomously. In this setting it becomes necessary to reconsider traditional planningmethods, in particular those addressing scheduling problems. The schedulingproblem is the last decision-making phase previous to the execution of productionplans. It involves a very short time horizon, relating work orders (that agree withthe requirements of customers) to physical resources of the organization (Pinedo,2016). It is natural to conclude that these aspects make scheduling decisions susceptibleto be impacted by Industry 4.0 developments (Liu et al., 2019).Scheduling problems require finding solutions to the problem of allocatingwork orders on machines, intending to achieve assignation efficiency according tosome performance metric. Once a solution has been found the schedule is executed.Then, unforeseen events and other real-world contingencies (machinebreakdowns or delays, for instance) may affect the normal implementation of theplan. Then, rescheduling processes have to be run in order to reassign jobs toother machines (Vieira et al., 2003; Ouelhadj and Petrovic, 2009).Traditional approaches do not contemplate systems in which there is a fluidinteraction between the physical and virtual aspects, where the latter can be representedby spaces of decision. The information obtained in the physical spacemodifies, in real time, the parameters of the cyberspace, leading to new decisionsthat affect the execution in the physical space. This loop is a feature of Industry4.0 technologies. But this real-time connection generates an excess of informationthat might trigger a reschedule. The tolerance scheduling problem (Rossit et al.,2019a) consists of taking up the information about unexpected events, evaluatingtheir magnitude according to the schedule being executed at the moment in whichthey arise. Rossit et al. (2019a) formulate this problem in full detail, but in thischapter, we intend to generate mixed-integer models and run numerical experimentshighlighting the virtues of this scheme of tolerances. As a base case wewill consider the single machine scheduling problem in which maximum tardinessis the objective.  
dc.format
application/pdf  
dc.language.iso
eng  
dc.publisher
Elsevier  
dc.rights
info:eu-repo/semantics/restrictedAccess  
dc.rights.uri
https://creativecommons.org/licenses/by-nc-sa/2.5/ar/  
dc.subject
SCHEDULING  
dc.subject
INDUSTRY 4.0  
dc.subject
LATENESS  
dc.subject
SMART SCHEDULING  
dc.subject
PRODUCTION  
dc.subject
SMART MANUFACTURING  
dc.subject
CYBER-PHYSICAL SYSTEMS  
dc.subject
RESCHEDULING  
dc.subject.classification
Otras Ingenierías y Tecnologías  
dc.subject.classification
Otras Ingenierías y Tecnologías  
dc.subject.classification
INGENIERÍAS Y TECNOLOGÍAS  
dc.title
The tolerance scheduling problem for maximum lateness in Industry 4.0 systems  
dc.type
info:eu-repo/semantics/publishedVersion  
dc.type
info:eu-repo/semantics/bookPart  
dc.type
info:ar-repo/semantics/parte de libro  
dc.date.updated
2020-12-04T15:06:37Z  
dc.journal.pagination
95-113  
dc.journal.pais
Países Bajos  
dc.journal.ciudad
Amsterdam  
dc.description.fil
Fil: Rossit, Daniel Alejandro. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Conicet - Bahía Blanca. Instituto de Matemática Bahía Blanca. Universidad Nacional del Sur. Departamento de Matemática. Instituto de Matemática Bahía Blanca; Argentina. Universidad Nacional del Sur. Departamento de Ingeniería; Argentina  
dc.description.fil
Fil: Tohmé, Fernando Abel. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Conicet - Bahía Blanca. Instituto de Matemática Bahía Blanca. Universidad Nacional del Sur. Departamento de Matemática. Instituto de Matemática Bahía Blanca; Argentina. Universidad Nacional del Sur. Departamento de Economía; Argentina  
dc.relation.alternativeid
info:eu-repo/semantics/altIdentifier/url/https://www.sciencedirect.com/science/article/pii/B9780128189061000048  
dc.relation.alternativeid
info:eu-repo/semantics/altIdentifier/doi/https://doi.org/10.1016/B978-0-12-818906-1.00004-8  
dc.conicet.paginas
421  
dc.source.titulo
Advances in Mathematics for Industry 4.0